Skip to main content
Passa alla visualizzazione normale.

TONI LUPO

Maintenance Planning For The Reliability Maximization In A Large System With Vagueness In The Reliability Values Of Some Components

  • Authors: Certa, A.; Galante, G.; Lupo, T.; Passannanti, G.
  • Publication year: 2015
  • Type: Articolo in rivista (Articolo in rivista)
  • OA Link: http://hdl.handle.net/10447/135259

Abstract

This paper tackles the problem to single out the maintenance actions to be executed on a production system during the planned stop of given length. In detail, from a reliability viewpoint the system is assimilated as a series-parallel multi-component system and the maintenance actions need to maximize the system reliability up to the next planned stop. Moreover, it is assumed that some components reliability values are affected by vagueness within a given range. To solve the considered problem, an exact dynamic programming algorithm suitable to quickly point out the maintenance scheduling is developed and, moreover, it is formulated a proper parameter able to express the robustness of the obtained optimal solutions. Finally, a numerical example with reference to a complex system composed by a large number of components is reported.